New Construction is in the works for a Late 2018 Completion date. The Madrona model with a Side Garage will be built. This model can have up to 4 bedrooms and 3 1/2 baths on all levels.
New Construction is in the works for a Late 2018 Completion date. The Madrona model with a Side Garage will be built. This model can have up to 4 bedrooms and 3 1/2 baths on all levels.